CONNECT WITH US

Sharp to begin volume production at 6G TFT LCD/TV factory four months early

Compiled from outside sources by Sui Wang, Research Center; Shih-wei Kao, DIGITIMES Asia 0

Sharp plans to begin volume production at its Kameyama, Mie Prefecture (Japan) factory, consisting of a six-generation (6G) TFT LCD line and an LCD TV line, between January 2004 and March 2004, earlier than the originally planned May 2004, according...

The article requires paid subscription. Subscribe Now