Already having built two 12-inch fabs in Taichung, Taiwan, ProMOS Technologies has acquired additional land at the same site for its third and fourth 12-inch fabs (Fab 5 and Fab 6), with construction slated to begin in the third quarter of 2007, according...
The article requires paid subscription. Subscribe Now