CONNECT WITH US

TSMC gearing up for 28nm production in 2011

Nancy Cheng, Taipei; Adam Hwang, DIGITIMES Asia 0

Taiwan Semiconductor Manufacturing Company (TSMC) has been adjusting its 28nm equipment to a manufacturing readiness maturity level of over 90%, and will start volume production using 28nm process as soon as possible in 2011, according to the company...

The article requires paid subscription. Subscribe Now