CONNECT WITH US

PSC to delay 12-inch equipment installation to May 2002

Hans Wu, Taipei; Christy Lee, DIGITIMES Asia 0

DRAM maker Powerchip Semiconductor (PSC) decided to delayed equipment installation in its 12-inch fab by at least one quarter to May 2002 to maintain the company’s financial strength and cope with the current industry downturn.

The article requires paid subscription. Subscribe Now